| 1954 | 1960 | Build/construction | will ultimately be connected to proposed new hospital sited to north-east |
| 27 May 1960 | | Completion | 60-bed in-patient unit, incl treatment areas and 2 neurosurgical operating theatres (3-storey theatre wing); 6-storey ward block on N-S axis - lower ground floor accomodates engineering, plant, staff rooms, remedial treatment depts, incl hydrotherapy, occupational therapy and physiotherapy; post-operative ward unit has 4 four-bed wards and 4 single-bed wards with toilet, duty room, kitchen, equipment and linen stores, treatment room and 2 day-rooms, with doctors' room, exam room and sister's office situated nr entrance; large x-ray suite links operating theatre and ward block at ground level; exterior treatments on main block: Westmorland green slate, plum coloured Dunbrik and Blaxter stone; east elevation - Derbyshire white quartz aggregate with black slate sills; theatre wing - mahogany cladding per Builder pp1042-1045 |