Basic Biographical Details

Name: Keller Ground Engineering
Designation:  
Born:  
Died:  
Bio Notes:  

Buildings and Designs

This was involved with the following buildings or structures from the date specified (click on an item to view details):
 Date startedBuilding nameTown, district or villageIslandCity or countyCountryNotes
Item 1 of 12000(?)The Weston Link  EdinburghScotlandKeller Ground Engineering were engaged to stabilise the Mound to facilitate the construction of teh Weston Link, whilst also shoring up the foundations of the RSA building. 350,000 litres of concrete were used in the process.

References

Currently, there are no references for this . The information has been derived from: the British Architectural Library / RIBA Directory of British Architects 1834-1914; Post Office Directories; and/or any sources listed under this individual's works.